- Joined
- Feb 1, 2019
- Messages
- 221
- Reaction score
- 251
I need a few ideas on how to achieve the desired delay on an Aerotech H148R-14A. It came with a 14 second delay element but my sims tell me that I need 9 seconds. The RMS Delay tool will give me either 10 seconds or 6 seconds if I use the 1/16 thick washer it will give me 2 seconds back making it 8 seconds. But for the best deployment I need between 8.80 and 9 seconds. I was thinking about adding a 1/32" shim under the washer but since this is my first foray into adjusting delays I wasn't sure if that would work. I know there are some +/- variance in the delay times so it may not be an issue. But if I go with 8 it could be 7 or 9 and if I go with 10 it could be 9 or 11.
This is going into a 3 1/2 lb. LOC IV and Rocksim says about 1800 feet which puts in an attitude that I'm comfortable with.
So I throw it out there for discussion
Thanks
This is going into a 3 1/2 lb. LOC IV and Rocksim says about 1800 feet which puts in an attitude that I'm comfortable with.
So I throw it out there for discussion
Thanks